Home » Materials Science and Manufacturing Engineering » Materials Science and Manufacturing Engineering Miscellaneous » Question

Materials Science and Manufacturing Engineering Miscellaneous

Materials Science and Manufacturing Engineering

  1. For a certain job, the cost of metal cutting is Rs. 180 C/V and the cost of tooling is Rs. 270 C/ (TV), where C is a constant, V is the cutting speed in m/min and T is the tool life in minutes. The Taylor's tool life equation is VT0.25 = 150. The cutting speed (in m/min) for the minimum total cost is________.
    1. 93.2
    2. 93.9
    3. 93.5
    4. 93.3
Correct Option: A

Lm =
18C
V

Cg =
270C
TV

VT0.25 = 150
Vopt = V = C
n
Lm
n
1 - nCg


= 150
0.25
×
18
T0.25
1 - 0.25270

= 150
1
×
18
×
1504
0.25
3270V4

= 150(57.914) ×
T1
0.25
V4

V = 150 × 57.914 ×
1
V

V2 =150 × 57.914
V = 93.2 m/min



Your comments will be displayed only after manual approval.