  1. The design speed for a two-lane road is 80 kmph. When a design vehicle with a wheel base of 6.6 m is negotiating a horizontal curve on that road, the off-tracking is measured as 0.096 m.The required widening of carriageway of the two-lane road on the curve is approximately
    1. 0.55 m
    2. 0.65 m
    3. 0.75 m
    4. 0.85 m
Correct Option: C

Off tracking means mechanical widening, i.e.
nL²
2R

0.096 =
nlL²
=
6.6²
2R2R

∴ R = 226.87 m
Psychological widening =
V
=
80
= 0.56 m
9.5√R9.5√226.87

Total widening = 0.56 + 2 × 0.096 = 0.75 m