  1. The expected time (te) of a PERT activity in terms of optimistic time (to), pessimistic time (tp) and most likely time (tl) is given by
    1. te =
      to + 4tl + tp
      6

    2. te =
      to + 4tp + tl
      6

    3. te =
      to + 4tl + tp
      3

    4. te =
      to + 4tp + tl
      3

Correct Option: A