A standard machine tool and an automatic machine tool are being compared for the production of a component.
For line balancing the number of work stations required for the activities M, E and T would respectively be
-
- 2, 3, 1
- 3, 2, 1
- 2, 4, 2
- 2, 1,3
Correct Option: D
Given data
Total cost of z1 component by using standard machine tool,
(TC)1 = | ![]() | + | ![]() | × 200 = 100 + | z1 | |||
60 | 60 | 30 |
Total cost of z2 component by using Automatic Machine tool,
(TC)2 = | ![]() | 2 + | × z2 | ![]() | × 800 = 1600 + | z2 | ||
60 | 30 |
Let break even point be z number of components
∴ 100 + | z = 1600 + | ||
30 | 30 |
or | z = 1500 | |
30 |
or z = | = 225 | |
200 |

Alternately:
Let N be the Break even number
At Break even point
![]() | + | .N | ![]() | = | ![]() | 2 + | ![]() | × | ||||
2 | 60 | 60 | 200 |
⇒ | + | N = | ![]() | 2 + | ![]() | × | ||||
2 | 60 | 60 | 200 |
⇒ | + | N = 8 + | |||
2 | 60 | 60 |
⇒ | N − | N = − | |||
60 | 60 | 2 |
⇒ | ![]() | ![]() | N = | ||
60 | 2 |
⇒ N = | = 225 | |
2 × 2 |