Home » Industrial Engineering » Industrial Engineering Miscellaneous » Question

Industrial Engineering Miscellaneous

Industrial Engineering

  1. A standard machine tool and an automatic machine tool are being compared for the production of a component.

    For line balancing the number of work stations required for the activities M, E and T would respectively be
    1. 2, 3, 1
    2. 3, 2, 1
    3. 2, 4, 2
    4. 2, 1,3
Correct Option: D

Given data

Total cost of z1 component by using standard machine tool,

(TC)1 =
30
+
22 × z1
× 200 = 100 +
2200
z1
606030

Total cost of z2 component by using Automatic Machine tool,
(TC)2 = 2 +
5
× z2 × 800 = 1600 +
2000
z2
6030

Let break even point be z number of components
∴  100 +
2200
z = 1600 +
2000z
3030

or  
200
z = 1500
30

or   z =
1500 × 30
= 225
200


Alternately:
Let N be the Break even number
At Break even point
1
+
22
.N = 2 +
5N
×
800
26060200

⇒ 
1
+
22
N = 2 +
5N
×
800
26060200

⇒ 
1
+
22
N = 8 +
20N
26060

⇒ 
22
N −
20
N = −
1
60602

⇒ 
22 − 20
N =
16 − 1
602

⇒  N =
15 × 60
= 225
2 × 2