Home » Aptitude » Percentage » Question
  1. Find the total output of a coalmine, if after 24% wastage the net output is 68,400 tonnes.
    1. 95000 tonnes
    2. 85000 tonnes
    3. 90000 tonnes
    4. None of these
Correct Option: C

Let the total output be x tonnes.
Then, net output

= x -
24
× x =
76x
100100

76
= 68,400
100

⇒ x =
68,400 × 100
= 90,000 tonnes.
76



Your comments will be displayed only after manual approval.