-
A, Band C can do a piece of work individually in 8, 12 and 15 days, respectively. A and B start working but A quits after working for 2 days. After this, C joins B till the completion of work. In how many days will the work be completed ?
-
- 58/9 days
- 46/7 days
- 67/13 days
- 33/4 days
Correct Option: A
Work done by A and B in 1 day
= (1/8) + (1/12) = 5/24
2 day's work of A and B = 10/24
After 2 day's A left the work
∴ Remaining work = 1 - (10/24) = 14/24
One day work of B and C together = (1/12) + (1/15) = 9/60
So, the number of days required by B and C to finish work
= (14/24) / (9/60) = (14/24) x (60/9) = 35/9
∴ Total days to complete the work = 2 + (35/9) = 53/9 = 58/9 days