-
A and B together can do a work in 8 days. If A alone can do it in 12 days, then in how many days can B alone do it ?
-
- 12 days
- 20 days
- 24 days
- 28 days
Correct Option: C
Required time taken by B to complete the work = xy / x - y
[Here x = 12 and y = 8]
⇒ required time = (12 x 8) / (12 - 8) = 96/4 = 24 days